transformer Active Part Assembly Platform

During the manufacturing process of large power transformers, the assembly of the “Active Part” is the most critical and high-risk stage in the entire production chain. When handling cores and windings that weigh anywhere from several tons to over a hundred tons, relying on conventional overhead cranes or makeshift scaffolding is not only highly inefficient but also poses immense hidden risks, including falls from height and structural deformation of components.

BEST™ Active Part Assembly Platform

BEST™ provide world-class transformer Active Part assembly tooling and elevating platforms. From the safe 90-degree upending of the core to the stable support required for high-level lead wire welding, our equipment is purpose-built to meet the most stringent HSE (Health, Safety, and Environment) standards. We empower you to achieve 100% safety and ultimate assembly precision in the manufacturing of UHV (Ultra-High Voltage) and heavy-duty transformers.

Core Stacking and Tilting Table

Active Part Assembly Lifting Platform

Explore Our Assembly Solutions

1. Active Part Assembly Lifting Platform

BEST™ Transformer Active Part Elevating Platform is purpose-built for lead wire connections, insulation wrapping, and tap changer installation, providing a rock-solid “ground-level” workspace at height for your large active part assembly. We offer both the classic hydraulic scissor-lift configuration and the multi-column mechanical screw drive system—the top-tier solution preferred in high-end European and American markets.

  • Core Advantage: The mechanical screw-driven models feature a “Dual Mechanical Self-Locking” mechanism (Zero Creep). Whether in the event of a power outage or during prolonged static suspension, the platform is completely immune to the gradual drifting or creeping caused by hydraulic micro-leaks, guaranteeing 100% safety for operations at height.

  • Scope of Application: Final assembly workshops for medium and large power transformers with heights exceeding 2 meters.

2. Core Stacking and Tilting Table

Once the horizontal lamination stacking of large transformer cores is complete, they must be positioned upright for winding assembly. Engineered with a heavy-duty welded steel structure and high-thrust multi-stage hydraulic cylinders, this series of equipment smoothly upends cores weighing from tens to over a hundred tons by a full 90 degrees. It completely eliminates the need for hazardous overhead crane lifting, achieving a seamless, zero-deformation upending process for heavy-duty active parts.

  • Core Advantages: Completely eliminates the sliding and deformation of silicon steel laminations typically caused by conventional overhead crane lifting. This vital protection preserves core integrity, minimizes no-load losses, and guarantees 100% operator safety.

  • Scope of Application: Core manufacturing for medium to large power transformers ranging from 35kV to 500kV.

Why choose our transformer assembly platform?

  • The Underlying Confidence of Heavy-Duty Engineering: Zero Compromise on Structural Integrity. We refuse to settle for lightweight alternatives. Our platform chassis features a heavy-duty, deep-foundation steel structure that has undergone rigorous Finite Element Analysis (FEA), ensuring rock-solid stability when operating at maximum rated capacities.

  • 100% Bespoke Engineering: No two transformer workshops are exactly alike. We offer one-on-one 3D modeling and tailored manufacturing based strictly on your specific parameters, including the maximum active part weight, maximum active part height, and your facility’s existing foundation conditions.

  • World-Class Safety Standards: Our electrical and hydraulic systems are fully compliant with CE and UL standards. Each unit comes standard with anti-fall safety locks, overload early-warning systems, and a one-touch emergency stop, safeguarding every lifting operation in your workshop.

Selection Guide FAQ: How to Choose the Right Assembly Platform?

Download Zone

Contact us with questions?

WhatsApp us +86-15552598879 for technical support or customization.

About us

BEST™, founded by Fan Yuxue in 2005, is dedicated to providing professional wire-winding and foil-winding technology solutions for global power transformer manufacturers.  Our technical team works closely with transformer manufacturers in different regions around the world, and can modularly expand standardized equipment according to customers’ specific products and manufacturing processes to meet the non-standard customization needs of more transformer manufacturers.

Learn more about us

BEST™

To date, leading transformer manufacturers from 46 countries and regions worldwide (including the United States, Canada, Mexico, Brazil, Turkey, Italy, Vietnam, Thailand, the Philippines, and Indonesia) have chosen BEST™ transformer winding machines. Xu Shaofeng, Senior Vice President of Schneider Electric, has repeatedly commented that “BEST™ is Schneider Electric’s best partner in China. BEST™ played a crucial role in the upgrading and commissioning of Schneider Electric’s largest transformer production base globally.”

Our Services

OEM non-standard custom and technical engineering supportGlobal after-sales response and digital remote supportGlobal spare parts warehouse and localized servicesUsed transformer refurbishment supportSpecial process supportVariable winding die support
social media

“Not just a transformer winding machine, but zero-defect coil winding guaranteed.”

Support by Mr. Robin

Pre-sales Engineer
Chat with us
Speak to our friendly team via live chat.
Jinan Best Intelligent Tech. Co., Ltd.robin@best-in-china.com+86-15552598879
Call us
Call our team Mon-Fri from 8am to 5pm.
+86-15552598879